Cooling tower water treatment in Surrey

Business parks and corporate campuses along the M3 and M25, research buildings around Guildford, hospitals and hotels across the county. Mostly comfort cooling, and mostly busy in summer.

Call 020 3633 6064

Business parks, campuses and hospitals

Surrey's cooling plant is mostly commercial. There are corporate headquarters and business parks along the M3 and M25 at places like Weybridge, Staines, Egham and Camberley, office and research buildings around Guildford, Woking, Leatherhead and Redhill, and a good spread of hospitals, private clinics, universities, hotels and conference venues. Most cool with chillers, and the larger sites reject heat through rooftop or ground-level towers.

Surrey business parks have one particular quirk: the neighbours. Plenty of them back onto housing, footpaths or schools, and a tower in the corner of a car park can be closer to someone's garden than to the office it serves. That puts extra weight on drift eliminators in good condition, sensible siting notes in the risk assessment and treatment that keeps counts consistently low.

Comfort cooling and the winter lay-up

Many Surrey towers serve comfort cooling. They work hard from late spring to early autumn and may be turned down or switched off over winter, and that on-off pattern is where trouble tends to start. HSG274 Part 1 expects a system idle for between a week and a month to be dosed and circulated at least weekly, and one idle for longer to be drained and properly recommissioned before it runs again. We write the lay-up and restart into your scheme so it isn't left to memory. Our post on restarting after a shutdown covers the sequence.

Cleaning frequency follows the same thinking. For a typical comfort-cooling tower, HSG274 Part 1 suggests at least twice a year as a guide, with the real figure set by inspection, your treatment history and the tower's surroundings. A park next to a building site or a busy road will foul faster than one surrounded by lawns. See how often a cooling tower should be cleaned.

Four water suppliers, one county

Surrey is shared between several water companies. SES Water supplies much of the east, including Redhill, Reigate, Leatherhead and Dorking. Affinity Water covers parts of the north-west such as Woking, Staines and Chertsey. Thames Water and South East Water supply other parts of the county. Most of it is hard, but because two sites a few miles apart can be on different supplies, we never copy a setpoint from one Surrey site to the next. We test the make-up water at each, and you can check yours on your supplier's postcode checker.

Travel and access

From Chiswick, north and east Surrey are a short drive down the A316, A3 or M3, and the M25 takes us round to the rest. Access is often easier than in central London: there's usually parking on site and the tower may be at ground level behind a fenced compound. Roof-mounted units on older office buildings can still mean fixed ladders, hatches and a permit to work, so we check the arrangements before the first visit.

Notification in Surrey

Environmental health in Surrey is run by the district and borough councils, such as Guildford, Woking, Runnymede, Spelthorne, Elmbridge, Reigate and Banstead, and the others across the county. Under the Notification of Cooling Towers and Evaporative Condensers Regulations 1992 you notify the council your premises are in. Contact your local council's environmental health team for the form.

Coverage

Towns we cover in Surrey

We're based in Chiswick, W4, and visit sites here from there. We also cover the south-west London boroughs that border Surrey, such as Kingston, Sutton and Richmond.

  • Guildford
  • Woking
  • Staines-upon-Thames
  • Egham
  • Chertsey
  • Addlestone
  • Weybridge
  • Walton-on-Thames
  • Esher
  • Cobham
  • Leatherhead
  • Epsom
  • Banstead
  • Redhill
  • Reigate
  • Dorking
  • Caterham
  • Oxted
  • Camberley
  • Farnham
  • Godalming
  • Haslemere

Other areas: London · Thames Valley & Berkshire · Hertfordshire · Kent · Essex · All areas

Questions

Cooling towers in Surrey: common questions

Who do we tell about a cooling tower in Surrey?

Your local council's environmental health team, at the district or borough council for your site rather than Surrey County Council. The Notification of Cooling Towers and Evaporative Condensers Regulations 1992 require written notice of each wet cooling tower and evaporative condenser on the premises.

Our tower is only used in summer. What should happen over winter?

It needs a plan, not just an off switch. HSG274 Part 1 expects a system idle for a week to a month to be dosed and circulated at least weekly, and one off for longer to be drained, cleaned and recommissioned before restart. We write this into your scheme and handle the spring restart.

How often should an office cooling tower in Surrey be cleaned?

As often as it fouls. For comfort cooling, HSG274 Part 1 gives at least twice a year as a typical guide, but the frequency should come from inspections and your risk assessment. A tower near construction work or a main road may need cleaning more often.

Which water company supplies our Surrey site?

It depends where you are. Four companies share Surrey between them (SES Water, Affinity Water, Thames Water and South East Water), and most of what they supply is hard. Check your supplier's postcode checker, and we'll test the make-up water ourselves before setting the treatment.

Looking after cooling towers in Surrey?

Tell us about your site and system and we'll come back with a clear, itemised quote and an honest view of what it needs.

Call 020 3633 6064
Call us